Energy

Detailed Design and Construction Supervision of Khlong Toey Underground Substation

Client: Metropolitan Electricity Authority (MEA)
Services: Detailed design, cost estimation, tender document preparation and construction supervision

The MEA planned to construct an underground substation in Klong Toey District to connect with the existing and future distribution systems. This pilot project on construction of an underground substation in a congested area is the first of its type in Thailand. The objectives were to reduce noise pollution, ensure public safety and mitigate environmental impacts. The project included construction of a four-story underground building with 22 meter-depth and installation of four power transformers with capacity of 115/69/24 kV–60 MVA, switchgears with capacity of 115 and 69 kV, and other control systems, i.e. fire safety, building service, and electrical grounding systems.

Read more

Detailed Design of Thilawa Oil Jetty, Yangon Division, Myanmar

Clients : Premium Petrol Co., Ltd. (PPCL) / Kaytumadi Co., Ltd. (KMA) 
Services : Detailed design, cost estimation and tender document preparation

PPCL and KMA, two major importers of oil in Myanmar, planned to construct an oil jetty. TEAM GROUP was requested to produce detailed design and prepare tender document. The project included a main berth for facilitating oil (diesel and gasoline) and LPG vessels with up to 25,000 dead weight tonnage (DWT) and water depth of -11 m.chart datum (CD), two inner berths for oil barges with 2,000 DWT and water depth of -4 m CD, 14-inch and 8-inch diesel pipes, 12-inch gasoline pipes, and 6-inch LPG pipes, fire fighting system, oil separator, lighting system, dredging work and embankment.

Read more

Undergrounding of Overhead Power Lines: Rama III and Nonsi Projects

Client: Metropolitan Electricity Authority (MEA)
Consultant: ATT Consultants Co., Ltd. (ATT)
Services: Study, design, and tender document preparation

The MEA launched projects on undergrounding overhead power lines in many areas of Greater Bangkok to secure its distribution system in the face of increasing demand for electricity and to enhance scenic views. Three projects namely Silom, Pathumwan and Chitralada had been accomplished and, in 2013, ATT was assigned to carry out a study and detailed design of an appropriate underground tunnel and to prepare tender documents for 10.9 km of Rama III Road and 8.3 km of Naradhiwas Rajanagarindra Road.

Get an supplementary amount sildenafil generic can be if you know ofknow ofbe aware of a few secrets that are very well hidden from the not the right people generic viagra online is a maze in which you necessity not to get lost.

Refinery and Oil Terminal in Phetchaburi

Clients: Bangchak Petroleum PLC
Administered by: ATT Consultants Co., Ltd.

In their effort to expand productivity for export purpose, Bangchak Petroleum assigned ATT to conduct technical due diligence of the 25,000 barrel-per-day refinery of Siam Gulf Petrochemical Co., Ltd. and the 500 million-liter oil terminal and marine facilities of Pan Asia Storage & Terminal Co., Ltd. Located in Phetchaburi, the refinery construction was completed and commissioned in early 2006 but has never been used while the oil terminal and marine facilities construction were completed in 1999 but were partially operated.

Read more