Water Supply Plant and Water Distribution System Construction Project in Tachileik, Republic of the Union of Myanmar

Client: Hein Linn San Co., Ltd.

Hein Linn San Co., Ltd. kick-started the construction of water supply pipeline networks and district metering area (DMA) in the sub area of Tachileik Town, Myanmar, covering an area of 14 sq.km. The total length of the water distribution pipe network is 165 km. The project includes the construction of water supply plant that has a capacity of 10,000 cu.m./day and a 14-kW power plant. TEAM GROUP was engaged in the feasibility study, survey and detailed design, project management and construction supervision

Read more

Construction Project of a Flood Prevention System for the Samlae Raw Water Pumping Station

Client: Metropolitan Waterworks Authority (MWA)
Consultant:
TEAM Consulting Engineering and Management Co., Ltd.
Services: Study, survey, design, construction cost estimation and tender document preparation

To prevent inundation of its production areas, the MWA developed a project on construction of a flood protection system for the Samlae Raw Water Pumping Station in the Samlae Sub-district of Mueang District in Pathum Thani, from where raw water from the Chao Phraya River is pumped and transmitted to the Prapa Canal – major water storage for Bang Khen, Samsen and Thon Buri Water Treatment Plants. These three plants are responsible for 70% of MWA’s productivity.

Read more

Improvement Project of a Raw Water Distribution System to Secure Productivity and Prevent Flooding

Client: Metropolitan Waterworks Authority (MWA)
Consultant:
TEAM Consulting Engineering and Management Co., Ltd.
Services: Survey and design, tender document preparation, and construction supervision

Thailand’s 2011 great flood caused an overflow of flood water and wastewater into the MWA’s raw water sources, resulting in the reduced quality of raw water. The MWA thus initiated a project on improvement of its raw water distribution system to ensure production stability and to prevent flooding on a permanent basis. The project has been implemented at the East Prapa Canal from the Samlae Raw Water Pumping Station to the Bang Khen Water Treatment Plant and features improvement of its distribution system; siphon systems at Bang Luang, Bang Sue, and Bang Khen; and Samsen Water Control Facility.

Read more

Feasibility Study on Industrial Estates in Khon Kaen, Udon Thani, Nakhon Ratchasima, and Nakhon Phanom Provinces

Client :         Industrial Estate Authority of Thailand (IEAT)
Consultant :     TEAM Consulting Engineering and Management Co., Ltd.

IEAT wished to implement physical, financial, management, marketing, and environmental feasibility studies for industrial estates in Khon Kaen, Udon Thani, Nakhon Ratchasima, and Nakhon Phanom provinces.