Survey and Detailed Design of Wastewater Collecting System (Additional System)

Client: Water Quality Management Office, Drainage and Sewerage Department, BMA

The survey and detailed design of Wastewater Collecting System (Additional System) from Huai Khwang District to Din Daeng Wasterwater Treatment Plant Project has the objectives in reviewing the existing studies and undertaking the survey and detailed design of wastewater collecting system (additional system) in Huai Khwang and adjacent area covering a total of 15 sq.km.

TEAM GROUP was assigned to undertake the feasibility study, system selection, and detailed design of the selected wastewater collecting system as well as bidding document preparation, public relations, and public participation. Project leaflets and video presentation were also provided by TEAM GROUP.





You are here