Environmental Management

EIA and HIA of the Wind Power Project

Client:   Thepsathit Wind Farm Co., Ltd.
Administered by:
TEAM Consulting Engineering and Management Co., Ltd.

In response to the Government’s policy on promotion of the Clean Development Mechanism and reduction of greenhouse gas emissions, as well as to support the increasing needs for electricity in Chaiyaphum Province, Thepsathit Wind Farm Co., Ltd. is initiating a project to generate electricity from wind power. A wind farm is planned for construction at a 44-rai site in Thep Sathit District, Chaiyaphum Province. Each 1-rai unit will be installed with one wind turbine with the capacity of 90 MW. Total electricity generated will amount to about 192,000 MW/hour per year, sufficient for approximately 31,947 households per annum.

Read more

Production of Biomass Power Using the Gasification Method

Client:   Kornburi Biomass Co., Ltd.
Administered by:
TEAM Consulting Engineering and Management Co., Ltd.

To promote clean energy and help attenuate the climate change crisis, Kornburi Biomass Co., Ltd. initiated a project to extract energy from biomass using the gasification method. Via this method, organic waste and agricultural residues are converted into carbon monoxide, hydrogen, and methane by reacting them in high temperatures with a controlled amount of oxygen and/or steam. The resulting gas mixture, called synthesis gas, is then used as fuel for the company’s 1.2 MW power plant.

Read more

EIA for the Chana Power Plant Project

Client: Electricity Generating Authority of Thailand (EGAT)
Administered by: TEAM Consulting Engineering and Management Co., Ltd.

The current installed capacity for electricity generation in Southern Thailand amounts to 2,485.58 MW. Major generators include the private Khanom thermal power plant in Nakhon Si Thammarat (824 MW), the Krabi thermal power plant in Krabi (340 MW) and the first unit of Chana combined cycle power plant in Songkhla (725 MW). To ensure sufficient electricity supply for economic and industrial development and to strengthen national energy stability,

Read more

EMP, RAP and Raw Water System Design for Hongsa Coal-Fired Power Plant, Lao PDR

Client: Banpu Public Company Limited  
Administered by: TEAM Consulting Engineering and Management Co., Ltd.

Located in Hongsa, Xayabouri Province, Lao PDR, this project is a large-scale Thai-Lao venture, for which Banpu PLC., Ratchaburi Electricity Generating Holding PCL. and the Lao Government are joint shareholders. It is the first thermal power plant and the largest ongoing power project in Lao PDR. With a generating capacity of 1,653 MW, the plant will enhance considerably Lao energy generating potential and stability.

Read more

You are here