Environmental Management

EIA for Coal-Fired Power Plant in Stueng Hav, Sihanoukville, Cambodia

Client: Cambodian Energy Limited
Administered by: TEAM Consulting Engineering and Management Co., Ltd.

TEAM Consulting and Management (Cambodia) Co., Ltd.

TEAM GROUP conducted an environmental impact assessment and set up a monitoring program to minimize the environmental impacts from the power plant in Stueng Hav, Sihanoukville.

Read more

Nam Ngum 2 Hydroelectric Power Project, Lao PDR

Client : CH. Karnchang Public Company Limited / SouthEast Asia Energy Limited / Nam Ngum 2 Power Company Limited
Administered by : TEAM Consulting Engineering and Management Co., Ltd. /  ATT Consultants Co., Ltd.

Nam Ngum 2 Hydroelectric Power Project is located at Baan Huay Bor, Vientiane. The project was constructed, managed, and supported by a group of Thai investors focused on GMS market. The concrete-faced rock-fill dam (CRFD) has a reservoir with a capacity of 6,774 million cubic metres, and a power house installed with a 615 MW capacity. Three generators with an annual capacity of 2,218 GWh of electricity will be installed. The electricity will be exported to Thailand via the Electricity Generating Authority of Thailand, thus boosting the economy of Lao PDR.

Read more

HIA for the MTT Jetty and Tank Farm Project

Client: Map Ta Phut Tank Terminal Co., Ltd.  (MTT)
Administered by: TEAM Consulting Engineering and Management Co., Ltd.

TEAM GROUP conducted a health impact assessment in accordance with national laws with the intention of anticipating the health impacts of the project, devising health impact mitigation measures and proposing health impact monitoring guidelines to verify the efficacy of the measures.

Read more

Environmental Monitoring for the Natural Gas Pipeline Project

Client : PTT Public Company Limited
Administered by: TEAM Consulting Engineering and Management Co., Ltd.

We put to use our full breadth of knowledge and experience in monitoring on implementation of the environmental impact mitigation measures and conducting an environmental quality examination for the extension of natural gas pipeline to the Government Complex on Chaeng Watthana Road and the National Energy Center throughout the 18-month construction. The extension covered the areas in Bangkok and Pathum Thani Province.

Read more