Environmental Management

Environmental and Social Impact Assessment for Betano Refinery Project, Timor-Leste

Client : TIMOR GAP, E.P.

TIMOR GAP, E.P. planned to construct the Betano Refinery which is the first refinery in Timor-Leste with an aim to produce petro-products for accommodating fuel demand at both national and international levels. The refinery site covers an area of approximately 230 hectares with a capacity of 30,000 barrels per day. The project also includes the construction of Nova Betano Town, water supply system and pipeline route for transporting products, i.e. condensate, light and heavy naphtha, and diesel from Betano Refinery to Suai in East Timor. TEAM GROUP was requested to conduct the Environmental and Social Impact Assessment (ESIA).

Read more

Natural Gas Pipeline to Ban Pho and Ban Len Power Plants

Client : Gulf BP Co., Ltd. and Gulf BL Co., Ltd.
Consultant: TEAM Consulting Engineering and Management Co., Ltd.
Service: EIA

Gulf BP and Gulf BL desired to construct a natural gas pipeline to meet the demand of its two power plants, Ban Pho and Ban Len, in the Hi-Tech Industrial Estate (Ban Wa) of Bang Pa In District in Phra Nakhon Si Ayutthaya. The pipeline alignment will start from the Nainat Village in Ban Wa Subdistrict and run 3.3 km to the estate. It will merge with the Nakhon Sawan on-land natural gas pipeline at the opposite side of the estate on Highway No. 32 (km 28+757) and run underground through Gate 2 into the estate. It will then run along Field Marshal Plaek Pibulsongkhram Road to the Marigot Jewellery (Thailand) Co., Ltd., from where it will run left to the Ban Len Power Plant Project.

Read more

Phou Ngoy Hydropower Project, Lao People’s Democratic Republic

Client : Charoen Energy and Water Asia Co., Ltd.
Consultant: TEAM Consulting Engineering and Management Co., Ltd / TEAM LAO Co., Ltd.
Service: EIA

Located in the Champasak District of Champasak Province in Lao PDR, the Phou Ngoy Hydropower Project comprises a run-of-river dam on the Mekong River. Its expected generating capacity is 651 MW and the electricity will be used domestically and sold to Thailand. TEAM Consulting Engineering and Management, in cooperation with TEAM LAO, conducted an ESIA for project development conforming to the Ministry of Natural Resources and Environment of Lao PDR. The mission covered actual environmental and social conditions, public participation activities, ESIA, and environmental and social management planning, to ensure minimum impact on natural resources, the environment and the people while generating optimum benefit to society.

Read more

Dawei Industrial Estate Development Project, Republic of the Union of Myanmar

Client : Italian-Thai Development PCL
Consultant: TEAM Consulting Engineering and Management Co., Ltd.

The Dawei Deep Sea Port and Industrial Estate Development Project aims to accommodate economic and commercial growth in Southeast Asia. However, development of its medium-scale and light industrial zones requires land acquisition, which will affect 10 villages. As such, TEAM GROUP was entrusted with the SIA and resettlement action plan (RAP). The intention is not only to minimize impacts on the people and provide fair compensation, but also to help improve their quality of life. The plan includes support in all aspects to encourage affected people to successfully adjust themselves to the new settlement and way of life.

Read more