Transportation & Logistics

Study, Design, and Traffic Solutions for Mega Bangna Shopping Center

Client: SF Development Co., Ltd. 

SF Development Co., Ltd., a retail leasing company, commenced business in 2008. In 2010, it joined hands with partners in developing the Mega Bangna Shopping Center. The project is situated in Bang Kaew Subdistrict, Bang Phli District, Samut Prakan Province.

Read more

Feasibility Study and Detailed Design for the Double-Track Railway (Thanon Chira Junction-Ubon Ratchathani Section) Project

Client: State Railway of Thailand (SRT)

The SRT was determined to develop rail transit networks and its services for a swifter and more efficient transport. This will help to upgrade Thailand's logistics system to meet the international standards. The Feasibility Study and Detailed Design for the Double-Track Railway (Thanon Chira Junction-Ubon Ratchathani Section) Project was thus implemented including development of a 307-km. track running past 34 stations, 7 stopping place in 16 districts of five provinces and construction of maintenance depot, railway stations, signaling system and telecommunication system.

Read more

Traffic Demand Study for Elevated Highway in Phnom Penh Project

Client: Overseas Cambodian Investment Corporation (OCIC) 

The OCIC aims to conduct a traffic demand study for the first expressway in Phnom Penh to ease the traffic congestion in Phnom Penh, from downtown area to the airport. The conceptual design involves an elevated expressway running from the east (the downtown area) to the west of Phnom Penh (the airport). The total length of expressway’s mainline is 12.016 km. An airport spur line is planned to directly connect with the expressway mainline to the airport terminal with a total length of 1.671 km.

Read more

Feasibility Study and Detailed Design for the Double-Track Railway (Chumphon-Surat Thani Section) Project

Client: State Railway of Thailand (SRT)

The SRT assigned TEAM GROUP to conduct a feasibility study and detailed design for the Double-Track Railway (Chumphon-Surat Thani Section) Project, which features construction of a meter gauge (one meter wide) track with a total length of 167.5 km., in parallel with the existing track from Chumphon Station to Surat Thani Station.

Read more

You are here