Transportation & Logistics

Feasibility Study on the Gold Line Light Rail Feeder System (BTS Krung Thon Buri Station-Khlong San District-Prajadhipok Section) Project

Client: Traffic and Transportation Department, Bangkok Metropolitan Administration

In line with traffic resolution policy, the BMA strived to develop rail transit systems with an aim of dissuading the use of personal vehicles and promoting public transport.  Traffic and Transportation Department wished to implement a feasibility study on project alignment. There were two phases including Phase 1 (BTS Krung Thon Buri Station-Taksin Hospital) with a total length of approximately 1.7 km. and Phase 2 (Taksin Hospital-Nearby Anongkharam Temple) with a total length of approximately 1.0 km.

Read more

Srinagarindra-Romklao Road Construction Project, Section 7: Construction of Interchange on Romklao and Chao Khun Thahan Roads

Client: Public Works Department, Bangkok Metropolitan Administration 

The Public Works Department planned to construct Srinagarindra-Romklao Road with an objective to relieve traffic congestion on nearby main roads, i.e. Srinagarindra and Ramkhamhang roads as well as Lam Sali Intersection. The project included connection to the Eastern Outer Ring Road with intent to facilitate traffic from On Nut and Romklao roads to minor roads in Bang Kapi, Saphan Sung and Lat Krabang districts. This will help to optimize land use for the enhanced quality of life, economy and environment in the areas.

Read more

Feasibility Study and Design for the Denchai - Chiang Mai Double Track Rail Project

Client: Office of  Transport and Traffic Policy and Planning
Consultants:
TEAM Consulting Engineering and Management Co., Ltd. / TLT Consultants Co., Ltd. / Daoreuk Communications Co., Ltd. /Geotechnical & Foundation Engineering Co., Ltd.

The double track railway from Denchai to Chiang Mai. Covering an area of Phrae, Lampang, Lamphun and Chiang Mai. The track will be one meter wide (Meter Gauge). Level crossings are to be improved so that travelling will be faster and more convenient.

Read more

Survey and Detailed Design of the Highway No.225 (Nakhon Sawan – Chum Saeng District) Construction Project

Client: Department of Highways
Consultants:
TEAM Consulting Engineering and Management Co., Ltd. / TLT Consultants Co., Ltd. / Daoreuk Communications Co., Ltd.  

The Highway No.225 (Nakhon Sawan – Chum Saeng District) Construction Project involves increasing traffic lanes from two to four along the 20-kilometer section from Nakhon Sawan to Chum Saeng District in order to accommodate increasing traffic volume. The project will help facilitate business trips by car as well as goods transportation.

Read more