Transportation & Logistics

Skylink Junction to Gaysorn Plaza

Client: Gaysorn Land Asset Management Co., Ltd. / Amarin Ratchaprasong Co., Ltd.
Consultant: TEAM Consulting Engineering and Management Co., Ltd.
Services: Construction management and supervision

To celebrate the 10th anniversary of operation in 2012, Gaysorn Shopping Center strived to reinforce its image with a new look. As part of this move, the Skylink connecting the shopping center building with Ratchaprasong Skywalk was upgraded by doubling its width from 3 m to 6 m, to ensure easy and spacious link to and from the shopping center.

Read more

Road Improvement for the 9th Asia-Europe Meeting at Vientiane, Lao PDR

Client: Department of Public Works and Transport, Vientiane Capital City
Administered by:
TEAM LAO Co., Ltd.
Services:
Consulting services for road construction and improvement

To prepare for the 9th Asia-Europe Meeting (ASEM) which Lao PDR would host on 5 and 6 November 2012, the Vientianne Authorities entrusted TEAM GROUP with consulting services for construction and improvement of roads to be used for the meeting. The project aimed to ensure road standards and enhance traffic efficiency of six roads: Kaysone, 2,900 m long; Fa Ngum, 3,100 m long; Dong Palan, 600 m long; Khou Viang, 3,600 m long; Khoun Bouloum 2,000 m long; and Nongbone, 4,000 m long.

Read more

Capacity Assessment and Strengthening of Bridges in Bangkok’s Vicinities

Client: Department of Rural Roads
Administered by: TEAM Consulting Engineering and Management Co., Ltd.
Services: Bridge condition survey, load-carrying test of bridge decks, evaluation of bridge remaining life, design and development of standard drawings for bridge deck strengthening

There are approximately 6,000 bridges across the country for which the Department of Rural Roads is currently responsible. These bridges were designed to have a maximum load-carrying capacity for a 10-wheel truck of 21 tons. However, the present load-carrying capacity for the truck can legally be up to 25 tons. Therefore, the Department assigned TEAM GROUP to study and conduct capacity assessment of bridge decks in Bangkok’s vicinities that require strengthening and to develop standard drawings for bridge deck strengthening for future maintenance.

Get an additional amount sildenafil generic can be if you be aware ofknow ofknow a few secrets that are very much well hidden from the not the right humanity generic viagra online is a maze in which you want not to get lost.

Blue Line Extension Project, Contract 2: Geotechnical Instrumentation Phase II

Client: CH. Karnchang PCL.
Consultant:
Geotechnical & Foundation Engineering Co., Ltd.

After TEAM GROUP installed settlement points and monitored ground and building settlement prior to construction of the underground track in 2011, we were assigned to continue with monitoring of geotechnical performance of the Blue Line Extension Project, Contract 2, which starts from Sanam Chai Station to Tha Phra Station, from where the underground track will be elevated. The mission included monitoring and forecast of soil performance to prevent undesirable effects such as damage to buildings in the project’s neighborhood caused by movement of the D-walls.

Read more

You are here