Feasibility Study Review for Green Line: Khu Khot-Lam Luk Ka and Samut Prakan-Bang Pu Sections

Client: Mass Rapid Transit Authority of Thailand

The Khu Khot-Lam Luk Ka and Samut Prakan-Bang Pu sections are the extension sections of the Green Line network. The Khu Khot-Lam Luk Ka section starts from the Khu Khot Station and runs along Lam Luk Ka Road, passes the Motorway No. 9, and ends at the Big C Hyper Market, Lam Luk Ka branch at the total length of 6.5 km. with four stations.

The Samut Prakan-Bang Pu Section starts from Samut Prakan Station at the depot in front of EGAT’s Bang Ping Sub-station as an elevated line along Sukhumvit Road and ends before reaching the Tamru-Bang Phli Intersection, at the total length of 9.2 km. with five stations.

TEAM GROUP was assigned with the services on feasibility study review, preparation of bidding documents for civil works and train system investor, train maintenance system, and train service.




You are here