Water Resources & Hydropower

Procurement and Installation of Dam Instrument and Automatic Data Transfer System for Huai Wang Nong Dam in Nong Phok District, Roi Et Province

Client : Royal Irrigation Department 

Huai Wang Nong Dam is an embankment dam on the Daeng River,  in Roi Ed Provice, Thailand.   The dam is 18.20 meter high and 900 meter long with a total reservoir capacity of 17 million cubic meters.  The dam was constructed in 1984 and completed in 1987 for the purpose of irrigation. To ensure dam safety during operation, dam instrumentation and proper monitoring and evaluation are extremely valuable in determining the performance of a dam.

Read more

Feasibility Study of Xepian-Houay Soi Hydropower Plant in Lao PDR

Client: D.M.D. Co., Ltd.
Consultant: TEAM Consulting International Co., Ltd. /  TEAM LAO Co., Ltd. / Geotechnical & Foundation Engineering Co., Ltd.

Xepian-Houay Soi Hydropower Plant Project is located in Attapeu Province in the south of Lao PDR. It has high potential for hydroelectric development. The existing components include Houay Soi Reservoir and Xepian Dam; bank sluices; a power plant; and a step-up substation or switch yard.

Read more

Study, Survey, and Preliminary Design for Enhancing the Drainage Capacity of Thawi Watthana and Phraya Ratchamontri Canals

Client: BMA’s Drainage and Sewerage Department
Consultant:
TEAM Consulting Engineering and Management Co., Ltd.

The great flood of 2011 had a huge effect on the area between Maha Sawat Canal and Phasi Charoen Canal on the west bank of the Chao Phraya River resulting from the sluggish of water drainage from the canals to the Chao Phraya and Tha Chin rivers, as well as to the Mahachai – Sanam Chai Kaem Ling catchment area.

Read more

Flood Study in 12 SPP Project Areas

Client : Gulf MP Company Limited (GMP)
Consultant:
TEAM Consulting Engineering and Management Co., Ltd.

GMP is currently developing 12 cogeneration small power plant (SPP) projects located in Nakhon Ratchasima, Saraburi, Phra Nakhon Si Ayutthaya, Prachin Buri, and Rayong provinces. TEAM GROUP was assigned to conduct the flood study for evaluating flood risks in the project area and to propose flood prevention and insurance measures for the power plants.