Water Resources & Hydropower

Data Preparation for PCKK Flood Modeling for Kumozu and Shinano River Basins

Client: Pacific Consultants Co., Ltd. (PCKK)
Consultant: TEAM Consulting Engineering and Management Co., Ltd.
Services: Preparation of topographic data for PCKK flood modeling

To assist PCKK in carrying out the main agreement with the Japanese government, TEAM GROUP provided services on data input preparation using GIS including: (a) attunement of laser profile (LP) data for model input; (b) creation of mesh data from the attuned LP data; and (c) grid level and schematization (dike alignment).

Read more

Study, Survey, Design and Tender Document Production for the Construction Project of a Flood Prevention System for the Samlae Raw Water Pumping Station

Client: Metropolitan Waterworks Authority (MWA)

To prevent inundation of its production areas, the MWA developed a project on construction of a flood protection system for the Samlae Raw Water Pumping Station in the Samlae Sub-district of Mueang District in Pathum Thani, from where raw water from the Chao Phraya River is pumped and transmitted to the Prapa Canal – major water storage for Bang Khen, Samsen and Thon Buri Water Treatment Plants. These three plants are responsible for 70% of MWA’s productivity.

Read more

Assessment and Design of Internal Drainage System of Nestlé’s Sunshine Factory, Republic of the Union of Myanmar

Client: Nestlé Waters Co., Ltd.
Consultant: TEAM Consulting Engineering and Management Co., Ltd.
Services: Study and design

A persistent problem of Nestlé’s Sunshine Factory is inundation in time of heavy rain and flood
water is greater than the capacity of the main external channel and culverts along Highway No. 2 in front of the factory. TEAM GROUP was thus engaged to perform hydrological study, assess the capacity of the factory’s drainage system, propose alternative solutions, design a new drainage system and flood prevention system if necessary and estimate the preliminary cost of construction.

Read more

Improvement Project of a Raw Water Distribution System to Secure Productivity and Prevent Flooding

Client: Metropolitan Waterworks Authority (MWA)
Consultant:
TEAM Consulting Engineering and Management Co., Ltd.
Services: Survey and design, tender document preparation, and construction supervision

Thailand’s 2011 great flood caused an overflow of flood water and wastewater into the MWA’s raw water sources, resulting in the reduced quality of raw water. The MWA thus initiated a project on improvement of its raw water distribution system to ensure production stability and to prevent flooding on a permanent basis. The project has been implemented at the East Prapa Canal from the Samlae Raw Water Pumping Station to the Bang Khen Water Treatment Plant and features improvement of its distribution system; siphon systems at Bang Luang, Bang Sue, and Bang Khen; and Samsen Water Control Facility.

Read more

You are here