CoP/ESA of Waste to Energy Project, Nong Khaem Solid Waste Disposal Center
Client : C&G Environmental Protection (Thailand) Co., Ltd.
C&G Environmental Protection (Thailand) Co., Ltd. is planning to construct a waste to energy project with a capacity of 1,000 tons per day by using incineration technology at Nong Khaem Solid Waste Disposal Center. Stoker-fired incinerator will be installed at the Center for incineration of municipal solid waste for electricity generation. Solid waste management by this method helps to reduce the garbage volume to be landfilled and promotes the maximum use of resources to the maximum benefit.
TEAM GROUP was assigned to carry out Code of Practice (CoP), Public Participation activities, as well as Environmental and Safety Assessment (ESA) of the project.