Dam Instrumentation for Reservoir Project
TEAM GROUP was entrusted with supply and installation of dam instruments at 15 dams in the Chi River Basin and the Mun River Basin, which are the two major river basins of the northeastern region, to closely monitor dam behavior to ensure its safety from any damages caused by earthquakes, sudden changes in water levels due to heavy rainfall or release of water for irrigation. The following automated instruments were installed:
- Piezometers
- V-Notch Weirs
- Observation Wells
- Reservoir Water Level Gauges
- In Place Inclinometer
Data Logger with Automatic Data Transmission System